Here are some before and after pictures of the new walls going in. The top left shows Tony framing the wall for the new store room and the wall where the new transmitter will sit. Remember the old MW50 and 316B transmitters used to occupy this space. The top right shows the walls roughed in. The new 3DX will sit in the opening nearest the camera. You can see into the new store room through the door. That is where the 316B used to be.
The lower left has us looking in from the outside door. If the old transmitters were still here, you would be looking at the back of them. Just about where Tony is standing is where the high voltage room for the MW50 used to be. The lower right shows how the new walls will look here.
Click on any photo for a larger view.
Updated 01/19/08
KCBS-KLLC-KITS ENGINEERING DEPT