KCBS Transmitter Site

Inside the KCBS Transmitter Building

KCBS AM racks_before

Now we are standing down near the DX50 and looking back to where the previous picture was taken. You can now see the nine equipment racks. These racks contain all the equipment needed to control the transmitters, handle the audio, and let us monitor all of the important parameters that we need to look at to keep KCBS operating properly. Behind the racks to the right are workbenches and tool storage.

At the far end on the right are some of the AC power panels and to the left is the bathroom.

In this photo you can notice that we have already started pulling down ceiling tile in preparation of the rebuild.


Previous Page Button gif _2.2 K homepage.gif - 2755 Bytes next Page Button gif _2.8 K


Questions or comments about the tour?
Contact Dave Wigfield at
wigfield@sfradio.cbs.com


Updated 01-14-08

KCBS-KLLC-KITS ENGINEERING DEPT
©Copyright DRW 2008