KCBS Transmitter Site

Remodeling

newfloor1.jpg - 45569 Bytesnewfloor3.jpg - 39690 Bytes

newfloor4.jpg - 33689 Bytessleepingarea2.jpg - 25908 Bytes

In the first photo, our flooring contractor is preparing the floor for the new tile. The next picture shows Mario putting down the new tile. The bottom left shows the finished tile inside the transmitter room and in the new storage area through the door. You can see the grounding strap for the 3DX transmitter on the floor. It sits in a channel between the floor tiles so that when we move the transmitter into place we don't run the risk of snagging the ground strap with the bottom of the transmitter. The last picture shows the inside of the storeroom looking towards the sleeping area.

Click on any photo for a larger view.