KCBS Transmitter Site

Remodeling

mw50and316.jpg - 42526 Bytesnewwalls3.jpg - 47618 Bytes

The first photo shows how the two old transmitters sat side by side. The right hand photo shows the new wall opening for the 3DX transmitter. The new opening is much shorter, the new wall with the storeroom door is about where the fourth cabinet of the old MW50 transmitter (the one closest to you) began. In the background is the old main entry way. We haven't used this for years but now we are re-opening it and it will be used as a mud room where we can take off muddy shoes in the winter and not have to track mud onto the kitchen area rugs. The tile in this area has been pulled up and will be replaced.

Click on any photo for a larger view.


Previous Page Button gif _2.2 K homepage.gif - 2755 Bytes next Page Button gif _2.8 K


Questions or comments about the tour?
Contact Dave Wigfield at
wigfield@sfradio.cbs.com


Updated 02/12/08

KCBS-KLLC-KITS ENGINEERING DEPT
©Copyright DRW 2008