KCBS Transmitter Site

Remodeling

newwall9.jpg - 62621 Bytesnewwall6.jpg - 45731 Bytes

newwall11.jpg - 46585 Bytesnewwall7.jpg - 61028 Bytes

Upper left photo shows some more detail of the old MW50 high voltage room. You can see the framework for the sleeping area. On the top right the walls have gone up. In case of an emergency where we have to operate out of the transmitter for an extended period of time, personnel can go in here and get some rest on a folding bed. The bed area will have a heater, its own lighting and shelves for personal items.

In the lower right, we are looking out of the sleeping area towards the rest of the store room. All of our emergency supplies will be located in here on shelves (water, food, toiletries, etc). The vent that is bisected by the new wall will be filled in and the remaining smaller vent will have a blower for ventilation. The bottom right is a view looking from the store room towards the new location of the 3DX transmitter.

Click on any photo for a larger view.


Previous Page Button gif _2.2 K homepage.gif - 2755 Bytes next Page Button gif _2.8 K


Questions or comments about the tour?
Contact Dave Wigfield at
wigfield@sfradio.cbs.com


Updated 01/19/08

KCBS-KLLC-KITS ENGINEERING DEPT
©Copyright DRW 2008